The outside of the house is pretty much complete. Painting, stain, and rockwork. Some minor problems but we anticipate they will be made good in the long run. The entry that Chris Wessling, our architect, designed came out relly well. The louvered panels underneath the front deck look better than we had hoped although a lot of work went into them by me (Bob). We got the idea from the hotel we all stayed at for Brad and Alicia's wedding if you wanted to know. The cabinets are being istalled and the pictures show part of the kitchen and the entry desk area. Enjoy.
Wednesday, May 09, 2007
The outside of the house is pretty much complete. Painting, stain, and rockwork. Some minor problems but we anticipate they will be made good in the long run. The entry that Chris Wessling, our architect, designed came out relly well. The louvered panels underneath the front deck look better than we had hoped although a lot of work went into them by me (Bob). We got the idea from the hotel we all stayed at for Brad and Alicia's wedding if you wanted to know. The cabinets are being istalled and the pictures show part of the kitchen and the entry desk area. Enjoy.
