Monday, January 22, 2007






With the new week we are starting off pretty well. First both the rough electrical and low voltage wiring were signed off. Hopefully the rough mechanical will be signed off tomorrow. The framers have been working on the soffits but today switched to the front entry as the big beam finally arrived. The picture of the fireplace shows some of the mechanical ducting. The scenery shot shows the lake that is now frozen and covered with a layer of snow. One more thing that has to be signed off is the framing after which the insulation and wall board can be started.